Current and Recent Projects
We are constantly beginning new projects that include replacing old, out-dated equipment with new and state-of-the-art products. Below are some projects that we are currently working on, some before and after photos, as well as job sites where we have recently completed major projects.
Servco recently replaced the existing Gordon-Piatt burners with new Cleaver-Brooks Profire burners. We also installed Flue Gas Recirculation (FGR) systems on each burner to help increase efficiency.
4 Photos
Servco has recently performed a large amount of work at the Malt-O-Meal facility in Tremonton, Utah. An emergency boiler re-tube compiled with a complete upgrade of their control systems will ensure efficient and reliable operation for years to come.
4 Photos
We recently removed Big J Milling's 1940's era Kewanee boiler and are in currently in the process of installing a new Cleaver-Brooks flextube style boiler.
6 Photos
Dannon Yogurt wanted to improve both their operation efficiency and also their gas consumption. Among the repairs and retro-fits Servco has performed there, the replacement of the existing Coen burner with a new Cleaver-Brooks Pro-Fire burner.
2 Photos
Servco replaced two old Kewanee boilers from the Ogden LDS temple with one Cleaver-Brooks flextube. The boiler room was built before the rest of the temple, so access to the room was limited. Cleaver-Brooks offers a field erect-able flextube boiler, which was what the temple decided to use.
3 Photos